What we shipped.
A running log across CMMS, FSM, Learn, and Systems. Small fixes included — the loop only holds together if both kinds ship.
August 2026
- 2026-08-14FSM· New
Route-aware batch dispatch
WO batch dispatch by route, respecting shift boundaries and technician skill match. Rolled out to all tenants Aug 14.
- 2026-08-05CMMS· Fix
PM schedule drift on DST boundaries
Preventive maintenance due-dates no longer shift by an hour across the March/November clock change.
July 2026
- 2026-07-22Systems· Improvement
CAPA linking from NCR view
Open a CAPA directly from a non-conformance record with process and owner pre-filled.
- 2026-07-09Learn· New
Expiry-driven access gates
A lapsed certification now blocks work-order start in CMMS and FSM, not just the dashboard badge.
June 2026
- 2026-06-18CMMS· Improvement
Spare-parts stockout warning on WO draft
Agents flag missing parts before a work order is released, not after the technician arrives on site.
- 2026-06-02FSM· Fix
Van stock sync race condition
Fixed a rare double-count when two technicians closed jobs from the same van within the same minute.
May 2026
- 2026-05-20Systems· New
Document revision family view
See every linked document across a controlled-document family and which are cited by an open NCR.
April 2026
- 2026-04-30CMMS· Improvement
Asset criticality now drives PM sort order
High-criticality assets surface first on the planner board instead of sorting by due date alone.
- 2026-04-11Learn· Fix
Practical assessment scoring rounding
Corrected a rounding error that could push a 79.5% practical score to a passing 80% display.
March 2026
- 2026-03-14FSM· New
SLA remaining-duration view
Dispatch boards show time-to-breach instead of a static colour, recalculated as jobs are reordered.
February 2026
- 2026-02-19Systems· Improvement
Audit finding clustering
Agents group similar findings across sites so one root cause doesn't produce eleven identical NCRs.
January 2026
- 2026-01-08CMMS· Fix
Work-order close-out photo upload on poor signal
Photo evidence now queues and retries instead of silently dropping on intermittent plant-floor connectivity.
RSS feed — coming soon
Have an operation that generic software can't fit?
Bring the loop that is currently a spreadsheet. We will say whether this is custom software, a product, an agent — or not ours.