Essential
$59
per user or per site · DEMO
Contact salesThe asset is the system of record. The work order is how it moves.
Open a tag — P-204, C-110, CV-12 — and see the jobs, the PM that should have run, the part that is missing, and the hours that did not. Adqueo CMMS is for maintenance managers who already know the plant, and need the loop to close.
| Checklist | Asset · job | Assignee | Status | Window |
|---|---|---|---|---|
60 3/5 steps | criticalWO-2026-1842 P-204 · Centrifugal pump Mechanical seal leak — inboard | Marta Solís Corrective | awaiting parts | 20 Aug · due today |
50 2/4 steps | urgentWO-2026-1831 CV-12 · Belt conveyor Belt tracking + lagging inspection | Elena Vargas Corrective | in progress | 20 Aug · due today |
0 0/4 steps | plannedWO-2026-1838 C-110 · Screw compressor Quarterly preventive — oil, filters, vibration | Rui Almeida Preventive | scheduled | 22 Aug · 2d window |
0 0/2 steps | standardWO-2026-1824 AHU-07 · Air handling unit Coil cleaning + differential pressure | Unassigned Preventive | open | 24 Aug · 4d window |


Create, assign, execute, close — on the asset, with labour, parts, and a checklist that survives the shift. A critical WO does not disappear into a chat. WO-2026-1842 stays open until the seal kit posts.
From a PM, a meter, or a leak in the pump house. The asset, last jobs, and stores are already on the record.
Craft and crew — Marta Solís, Rui Almeida, Elena Vargas — not a nameless queue.
Checklist, isolation, photos. Awaiting parts is a state, not a comment.
Hours and parts post. The next PM is honest because this one actually finished.
| WO | Asset | Location | Type | Priority | Assigned To | Due | Status |
|---|---|---|---|---|---|---|---|
| WO-2026-1842 | P-204 | North Plant · Pump house | Corrective | critical | Marta Solís | 20 Aug | awaiting parts |
| WO-2026-1831 | CV-12 | Line 3 · Packing | Corrective | urgent | Elena Vargas | 20 Aug | in progress |
| WO-2026-1838 | C-110 | West Yard · Utilities | Preventive | planned | Rui Almeida | 22 Aug | scheduled |
| WO-2026-1845 | C-110 | West Yard · Utilities | Corrective | urgent | Rui Almeida | 12 Aug | complete |
| WO-2026-1824 | AHU-07 | North Plant · HVAC gallery | Preventive | standard | Unassigned | 24 Aug | open |
| WO-2026-1819 | XF-02 | Substation B | Inspection | standard | Nuria Pellicer | 18 Aug | complete |
| WO-2026-1802 | C-110 | West Yard · Utilities | Corrective | urgent | Rui Almeida | 07 Aug | complete |
| WO-2026-1794 | C-110 | West Yard · Utilities | Corrective | standard | Marta Solís | 03 Aug | complete |
| WO-2026-1828 | TK-14 | North Plant · Process | Inspection | standard | Elena Vargas | 25 Aug | scheduled |
Company → plant → production line → equipment → component. Open Compressor C-110 and read health, criticality A, 8,142 h runtime, the next PM, and the three correctives that explain this month.
Compressor · oil-injected screw
Plant air compressor feeding West Yard and Line 3. Criticality A. Three corrective WOs in August (WO-2026-1794, 1802, 1845) plus the quarterly PM still scheduled.

Lubrication, inspection, filter replacement, calibration, vibration check — on a week you can defend. Overdue is red because it is late, not because a dashboard likes colour. Compliance is 91% this period, 94% trailing.
Marta, Rui, and Elena have capacity. Planned hours, priority, and the Line 3 shutdown sit on the same day. A planner can see who is already on P-204 before promising C-110.
On hand, reserved, min, bin, supplier. Seal Kit SK-P204 is at zero — WO-2026-1842 cannot close. Bearing 6205-2RS, Drive Belt AX42, Hydraulic Filter HF-210 live in the same ledger as the jobs that consume them.
| Part | SKU | On Hand | Reserved | Min | Location | Supplier | Status |
|---|---|---|---|---|---|---|---|
| Seal Kit SK-P204 | SL-204-IB | 0 | 1 | 2 | Bin A-12 | Rotating Stores Co. | Reorder |
| Bearing 6205-2RS | 6205-2RS | 14 | 2 | 8 | Bin B-04 | Rotating Stores Co. | Healthy |
| Drive Belt AX42 | AX42 | 3 | 1 | 4 | Bin B-09 | Line Stores | Low Stock |
| Hydraulic Filter HF-210 | HF-210 | 6 | 2 | 4 | Bin F-11 | Utilities OEM | Healthy |
Reserved by WO-2026-1842 · PO-8891 due 21 Aug

One downtime chart. A table of problem assets. C-110 took 7.8 h this month and failed three times — that is the conversation, not a wall of gauges. MTBF, MTTR, availability, cost (DEMO), PM compliance sit on the same WOs.
| Asset | Downtime | Repeat failures | Last WO | What the record says |
|---|---|---|---|---|
| C-110 · Screw compressor | 7.8 h | 3cluster | WO-2026-1845 | DE bearing / alignment not closed |
| P-204 · Centrifugal pump | 6.5 h | 1 | WO-2026-1842 | Inboard seal · awaiting SK-P204 |
| CV-12 · Belt conveyor | 3.1 h | 2 | WO-2026-1831 | Tracking / lagging |
| AHU-07 · Air handling unit | 0.8 h | 0 | WO-2026-1824 | Coil ΔP — planned |
Today’s jobs on the phone: 09:00 pump inspection, 11:30 conveyor PM, 14:00 compressor repair. Issue, checklist, photos, parts used, labour, notes, signature. Not a PDF emailed after the shift.
Follow-up on WO-2026-1845. Confirm DE bearing fit and record alignment vs OEM 0.05 mm.
RMS down from 7.8 to 4.6 mm/s after last close. Alignment sheet still missing.

Ask why Compressor C-110 raised three corrective work orders this month. The answer cites work history, meters, the OEM alignment spec, issued parts, and inspections. Suggested next steps are work, not magic. A person still releases critical jobs.
Why has Compressor C-110 generated three corrective work orders this month?
The three correctives share a rotating-equipment path, not three unrelated faults. WO-2026-1794 closed without an alignment sheet. WO-2026-1802 replaced separator filters after ΔP. WO-2026-1845 replaced the DE bearing and again deferred alignment when production released the machine. Vibration dropped after the bearing, but the OEM offset was never recorded. The quarterly PM is still ahead of us — it is the first planned vibration survey this period, not a fourth failure.
A CMMS is a set of records that have to agree. This is the inventory of those records — not a mosaic of icons.
Tags, hierarchy, criticality, health, serials, runtime.
Corrective, preventive, inspection — labour, parts, close rules.
Calendar and meter plans that generate WOs instead of a forgotten sheet.
Routes and condition codes that file onto the asset.
On hand, reserved, min/max, bins. Awaiting parts can block close.
Reorder, PO link (PO-8891), goods-in that releases the WO.
Craft, hours, crew capacity against the day.
Suppliers on the part, contractors on the WO.
Hours, vibration, ΔP — usage that trips PM.
OEM manuals, LOTO, P&IDs on the tag, not in a shared drive.
Today’s jobs, checklist, photos, signature at the asset.
Open work, PM compliance, critical assets, downtime hours.
Overdue, parts arrived, PM generated — attributable.
Critical WOs and inventory exceptions need a second pair of hands.
Who created, assigned, reserved, closed — with the same identifiers.
Assets, WOs, meters, stock as contracts, not a CSV hope.
A plant already has systems. CMMS has to speak to them as events and identifiers — P-204, WO-2026-1842, SKU SL-204-IB — not as a slide of brands.
Items, POs, cost centres. Stores quantity is not a second opinion.
Historians and condition that can open a WO, with a person still releasing critical work.
Labour and parts cost on close, labelled when DEMO.
Identity from the directory you already run.
Notifications as a last-mile channel, not the system of record.
Read/write on assets, work, meters, stock.
Exports and warehouse feeds that reconcile to the same WOs.
Maintenance Admin, Planner, Supervisor, Technician, Viewer. Critical closes and stock exceptions can require a second closer. Every state change is attributable. This is not an IAM product page — it is who may touch P-204.
| Role | Work orders | Assets | PM | Inventory | Approve | Audit |
|---|---|---|---|---|---|---|
| Maintenance Admin | all | edit | edit | edit | ● | ● |
| Planner | create/assign | edit | edit | reserve | — | read |
| Supervisor | assign/close | read | read | reserve | ● | read |
| Technician | execute/close* | read | execute | issue | — | — |
| Viewer | read | read | read | read | — | — |
Critical WOs on A assets (P-204, C-110) need a supervisor close. Inventory at zero cannot close awaiting-parts work.
19 Aug 09:48 · Stores · reserved SL-204-IB on WO-2026-1842
19 Aug 09:40 · Marta Solís · status → awaiting_parts
Technician close* on critical assets is gated. Viewer never edits.
Technician close on critical assets can be policy-gated (close*). Viewer never edits. Audit is a log, not a role that rewrites history.
Figures below are DEMO — per user or per site, blended, until a commercial schedule exists. Enterprise is contact sales. Nothing here is a quote.
Annual DEMO −18% · DEMO
$59
per user or per site · DEMO
Contact sales$159
per user or per site · DEMO
Contact salesContact sales
DEMO
Contact sales| DEMO | Essential | Professional | Enterprise |
|---|---|---|---|
| Work Orders | ● | ● | ● |
| Assets | 1 site | Multi-area | Multi-site |
| PM | Calendar | Calendar + meters | ● |
| Mobile | ● | ● | ● |
| Inventory | Basic | ● | ● |
| Analytics | KPIs | Reliability | Plant + export |
| API | — | ● | ● |
| SSO | — | — | ● |
| Advanced Permissions | Basic | Site + craft | Custom |
| Multi-site | — | Up to 5 | ● |
| AI | — | Copilot optional | Scoped |
| Support | Named | Contract |
A CMMS demo is a reading of your assets, crews, and the WO that is currently lying. Bring a painful class of equipment.