Latest Adqueo update: Fix · CMMS: PM schedule drift on DST boundariesSee what's new →
Adqueoby Tecapa

Adqueo CMMSAlpha access

Plan the week. Not the emergency.

Work orders with their real cost, preventive work by calendar or by meter, each technician’s capacity, and reliability per asset: MTBF, MTTR, and root cause analysis. Adqueo CMMS tells you which asset costs money, why it fails, and what to do first.

In alpha access for a small group of plants, in the browser and on the phone. We start with the area that costs you the most.

CMMSWork ScheduleSample view

ScheduleWork in progress

Oct 7 – Oct 13

Work

Wed

7

Thu

8

Fri

9

Sat

10

Sun

11

Mon

12

Tue

13

Team load

Overdue 3

PM Capper #1

09-00002

−5 d

Failure on Blow Molder S-60

09-00009

−3 d

Failure on Shrink Tunnel

09-00016

−3 d

Scheduled 8

Failure on Labeler

09-00010

8 Oct

PM Filler #1

09-00003

9 Oct

Failure on Steam Boiler

09-00017

9 Oct

Replace the pump suction filter

10-00002

11 Oct

Predictive: Steam Boiler

09-00022

13 Oct

PM Air Compressor #1

09-00026

15 Oct

Request: Filler #2

09-00020

17 Oct

Predictive: Shrink Tunnel

09-00023

19 Oct

Reference range

What working in corrective mode costs

3–5×

what a corrective repair typically costs compared with the same job done as planned work.

70–80%

planned work is the usual target in plants with a mature preventive program.

Repeat failures, eliminated at the root

When a piece of equipment fails twice for the same cause, the system suggests it as an analysis case. Each case moves forward with actions, owners, and a commitment date, and it only closes once it is verified that the failure did not return.

  1. 01Repeat failure
  2. 02Define problem
  3. 03Investigate cause
  4. 04Execute actions
  5. 05Verify effectiveness
  6. 06Closed
CMMSRCA reliability · BoardSample view

Active cases

3

in investigation or action

Overdue actions

1

see My actions

To verify

0

closed, effectiveness not reviewed

Closed

1

see History

SuggestedFailures that repeat according to work order closures, with no open case

Equipment90 days

Temperature sensor · Overheating

D-TUNEL · Shrink Tunnel

2 correctives · $1,240

Define problem1
RCA-26-00004High

Premature filling-valve wear on the fillers

Family · Fillers

Filling

Commitment Nov 1

Investigate cause1
RCA-26-00003High

High temperature in compressor element

Air Compressor #1

Air compressors

1/1 actions

Commitment Oct 26

Execute actions1
RCA-26-00002High

Seal leaks on boiler feed pump

Steam Boiler

Steam boilers

1/3 actions

Commitment Oct 141 overdue

Verify effectiveness0

Closed cases waiting for the effectiveness review.

From the failure report to the cost per asset

Orders, plans, parts, inspections, and costs on a single record: the number finance sees is the work that was done on the floor.

CMMSKPIs / Reports · SummarySample view

Analytics center

Maintenance Analytics Center

Scope · All plants and equipment

Confidence 100%

PM on-time compliance

92%

23 of 25 PMs on time

Maintenance MTTR

3.4h

Actual start / close

MTBF

312h

Between corrective failures

Total cost

$18,420

Labor $7,960

Work order trend

Created by type in the period

01224Sep 08Sep 15Sep 22Sep 29Oct 06
KPIs

Reliability and cost on one dashboard

Preventive compliance, MTTR, MTBF, and period cost, with the work order trend by type. You see whether preventive work is displacing corrective work, which is where the savings are.

  • PM on-time compliance, by plant and by equipment
  • MTTR and MTBF calculated from every order’s closure
  • Preventive, corrective, and predictive mix for the period
CMMSWO-2481 · Hours & costSample view

Parts

US$36.80

WO total

US$346.30

Actual costs and consumption

Parts consumed, contractor and in-house labor.

Reference / itemQtySubtotal

SKF 6205-2RS bearing

RP-0770

2US$36.80

Alineaciones Industriales del Norte

F-00871

GLBUS$180.00

In-house labor

Regular 6.0 h · Overtime 0.5 h

MOUS$129.50
Total running costUS$346.30
Costs

Every order with its real cost

Parts, contractors, and regular and overtime labor add up on the order as it happens. You know the month’s cost before the accounting close.

  • Cost per order: parts, contractors, and labor
  • Planned hours against actual hours
  • Cost charged to the asset, its area, and its line
CMMSKPIs / Reports · CostsSample view

Cost by WO type

Parts + external services + labor

  • Corrective
  • Preventive
  • US$ per month

Cumulative savings over 12 months$158,400

Savings

The savings of going preventive, month by month

Preventive against corrective cost on the same chart. When preventive goes up, expensive correctives go down, and the saving is measured in dollars.

  • Cost by work order type, month by month
  • Asset Pareto by cost: the worst first
  • A saving you measure, not one you are promised
CMMSStoreroom / Stock · PartSample view

SKF 6205-2RS bearing

SKU RP-0770
Below minimumBearings

6

On hand

pcs

2

Reserved

pcs

4

Available

pcs

8

Minimum

pcs

24

Maximum

pcs

Unit cost
US$18.40
Total value
US$110.40
Reorder point
8
Suggested
18 pcs

Movement history

Issue

2 days ago

WO-2481 · Centrifugal pump B-204

-2

→6

Issue

9 days ago

WO-2417 · Compressor CA-02

-1

→8

Receipt

3 weeks ago

PO-1187 · Rodamientos Andinos

+6

→9

Inventory

Parts with minimum, maximum, and reorder point

On hand, reserved, and available per storeroom, with reorder point and total value. No missing kits during a stop and no cash asleep on shelves.

  • Minimum, maximum, and reorder point per part
  • Reservations per work order
  • Movement history with its order
CMMSInspections · RunSample view

Pump route · Packaging L2

INS-0418 · Packaging L2 · Rubén Castillo

In progress
Stop 2 of 3 · Centrifugal pump B-2047/12Question 4 of 5 · 1 finding · view route

Stop 2 of 3 · Readings · question 4 of 5

Coupling-side bearing temperature (°C)*

Operating range 40–75 °C. Measure with an infrared thermometer.

Recorded reading: 68
Inspections

Rounds from the phone, findings to orders

Checklists with operating ranges in the phone’s browser, nothing to install. The technician reports the finding and you decide whether it becomes a work order.

  • Operating range on every question
  • Photos as evidence of the finding
  • From finding to order, without retyping

A record that the plant and finance both trust

CMMSAssets · HierarchySample view
  • D-Bottling Plant DemoSite
  • D-Process PlantGroup
  • Blow Molding AreaGroup
  • Blow Molder S-60Criticality A
  • Filling and Labeling AreaGroup
  • Process UtilitiesGroup
  • Steam BoilerCriticality A
  • Air Compressor #1Criticality B

Everything tied to its asset

Every order, part, and hour is charged to an asset in your hierarchy: plant, area, line, and equipment, with its criticality.

CMMSSettings · RolesSample view
  • AdministratorConfigures sites, users, and plans
  • PlannerSchedules preventive work and the week
  • SupervisorApproves and closes their area’s orders
  • TechnicianRuns their orders from the phone
  • StoreroomReceipts, issues, and part reservations
  • RequesterReports failures and tracks the request

Everyone sees their own

Six roles with per-site access: technicians see their orders, the storeroom its movements, and requesters the status of their request.

CMMSAudit logSample view
  1. Shift Supervisor closed WO 09-0001010/07 16:42

  2. Storeroom issued SKF 6205-2RS bearing (−2) to WO-248110/07 11:05

  3. Planner moved 09-00017 to In progress10/07 08:12

  4. Admin Demo updated the Capper PM strategy10/06 17:30

An audit log nobody edits

Closing an order, changing its status, or moving inventory goes into an audit log that nobody can edit.

Buildings and retail

Not just plants: buildings and shopping centers too

The same control works wherever there is equipment to keep running: chillers, elevators, pumps, substations, and lighting. Every job is charged to its asset and grouped by building or area.

  • Preventive work for HVAC, elevators, and pumping
  • Costs grouped by building or area
  • Stopped equipment and overdue orders, by area
CMMSHome · Plant statusSample view
Stopped assets-112 degraded
Overdue-341 critical open

Plant status

  • Packaging L1: degraded5 WOs · 1 overdue
  • Packaging L2: stopped7 WOs · 2 overdue
  • Boilers: running3 WOs
  • Compressors: degraded4 WOs · 1 overdue
  • Utilities: running2 WOs
  • Water treatment: running1 WO

Green running · amber degraded · red stopped

Tecapa Electric

On-site maintenance · El Salvador

Rather have it done for you? Tecapa Electric does the work

Adqueo CMMS is the software of Tecapa Electric, an electrical services and facility maintenance company. Beyond the platform, its technicians carry out the maintenance at your plant, building, or office.

  • 01

    Your team runs it

    Your staff record, control, and plan their maintenance in Adqueo CMMS.

  • 02

    Tecapa manages it

    Tecapa runs the whole plan, from execution to control: it schedules visits, does the work, and hands you the history.

Every Tecapa maintenance client gets the record of their assets, what was done on each one, and what it cost.

On-site service · El Salvador

Maintenance audit with Tecapa Electric

Tecapa Electric engineers review your assets, your preventive strategy, and how work is done today. They deliver the diagnosis with its starting figures and the improvement plan loaded into Adqueo CMMS, so you measure progress from the first month.

A service byTecapa Electric

On-site service available in El Salvador. Adqueo CMMS is available in every country.

Tecapa phone and WhatsApp: +503 7866-3112

Plant maintenance auditTecapa Electric
  1. 01

    Asset inventory and criticality

    We walk the plant and survey the equipment with its location, technical data, and criticality based on its impact on production.

    You leave with: Asset hierarchy with criticality

  2. 02

    Preventive diagnosis

    We review your plans, their frequency, and their actual compliance, plus the backlog of pending corrective work.

    You leave with: Preventive plan gaps, by equipment

  3. 03

    Starting indicators

    With your history we calculate preventive compliance, MTBF, MTTR, and cost per asset.

    You leave with: Reliability and cost baseline

  4. 04

    Improvement plan in Adqueo CMMS

    We load the preventive plans, inspection rounds, and priorities, ready to execute.

    You leave with: Maintenance plan ready to execute

How you get started

A staged rollout that starts with one area. Timelines are a reference for a plant with a reasonable asset list; a multi-site rollout takes longer.

  1. 01

    Week 1

    Conversation and diagnosis

    We review your assets, your crew, and how you record work and spend today. We pick a pilot area with a problem that hurts.

    You end with: Pilot scope and a list of data to gather

  2. 02

    Weeks 2–3

    Assets, areas, and parts

    We import your asset list with its codes, the plant hierarchy (plants, areas, lines), and the parts inventory from Excel. Your codes stay as they are.

    You end with: Asset register and storeroom loaded

  3. 03

    Weeks 3–6

    Orders and preventive work in the pilot area

    Your crew starts working with orders from the phone. We load the first preventive plans and the week is planned in the CMMS.

    You end with: Technicians logging hours and materials

  4. 04

    Months 2–3

    Your first numbers

    With real data: cost by asset, area, and line, preventive vs. corrective cost, preventive compliance, and hours per technician. You decide where to extend and what to adjust.

    You end with: First spend and hours report

  5. 05

    After

    Extend to the rest of the plant

    You add areas, inspections, and preventive plans at your pace, with the pilot as the model.

    You end with: The whole plant on one record

Start with the area that costs you the most

In a first conversation we review your assets, your crew, and your current spend, and we tell you where the first saving would be. Bring the equipment that fails the most.

Questions

Have another question? Write to us

Does your process not fit this product? Custom software →