Leak at the ball-valve joint on the return line. Mains pressure 3.2 bar.
Message · 8f2c41a0
Adqueo FieldComing soon
Adqueo Field organizes your field service: you dispatch without phone calls, the technician arrives with the parts already reserved, closes on site with photos and a signature, and the invoice comes from the same job.
9 visits in the visible range · 2 unscheduled.
Unscheduled (2)
Next: Drag onto the board
Next: Drag onto the board
Carla Duarte
3 visits · 7.5 h plannedNext: Close
Mirador del Valle Hotel · Basement 1Next: Dispatch
San Rafael Clinic · Tower BThe work gets done, but it is coordinated by phone, closed on paper, and billed weeks later. Every hand-off between people and paper costs you a visit or a payment.
The technician arrives without the part or the right information, and has to come back another day.
The schedule lives on a whiteboard and in a chat. Two visits overlap and nobody notices until the customer calls.
The signed sheet comes back days later, illegible or incomplete, and without it you cannot invoice.
The customer approves by email, by phone, or not at all, and nobody turns the yes into a scheduled job.
Outcomes
Each outcome comes from a real view of the app. Views are samples with fictitious data.
Swipe to see all six outcomes.
01 / 06
You see every technician’s day on one board. Drag a visit into their lane and the app rejects it if it overlaps another visit or falls outside their shift.
Outcome: fewer calls to reshuffle the day and no two visits in the same slot.
11 visits in the visible range.
Martín Echeverría
3 visits · 6.5 h plannedNext: Arrived
Next: Dispatch
Diego Ferrari
2 visits · 4.5 h plannedNext: Dispatch
Daily view · company time zone (America/Guayaquil)
02 / 06
Each work order carries its budgeted parts, reserved before leaving, and the checklist that fits the job. Whatever is used comes out of stock and into the order’s cost.
Outcome: fewer repeat visits because a part was missing.
| Material | Budg.Budgeted | Resv.Reserved | Used |
|---|---|---|---|
Run capacitor 45/5 µF CAP-4505 | 1 | 1 | 0 |
R-410A refrigerant (kg) REF-410A | 2.5 | 2.5 | 0 |
2-pole contactor 30 A CON-2P30 | 1 | 1 | 0 |
Stock deducted and actual cost recorded on this order. Receiving into a warehouse adds no job cost. A reservation does not move the stock ledger.
03 / 06
From their phone, the technician taps “En route”, checks in, adds notes, takes photos, and asks for the customer’s signature. With no signal, it is saved on the phone and synced later.
Outcome: evidence arrives the same day, with no sheets to lose.
Photos and signature
Photo uploaded
Photo uploaded
Signature uploaded
Time
Clock-in 10:42 AM · In progress
04 / 06
You email the quote. The customer picks between options, sees the total, and signs from their phone. On approval, the job is created automatically and ready to schedule.
Outcome: the customer’s yes becomes a scheduled job the same day.
Choose 1
By signing you approve the quote and authorize the work to start.
05 / 06
Job lines are added while the order runs. Once the order is completed, you generate the invoice from it, issue it, and email it; payments are recorded against the balance.
Outcome: you get paid sooner, with evidence behind every line.
| Description | QtyQuantity | Unit price |
|---|---|---|
| Technician labor (h) | 3 | $45.00 |
| 1" bronze ball valve | 2 | $38.50 |
| Emergency call-out | 1 | $760.00 |
| Number | Status | Balance | |
|---|---|---|---|
| FAC-0091 | Awaiting payment | $1,088.64 | $1,088.64 |
06 / 06
Operations reports calculate, from your own data, how many jobs are completed, how many are fixed in a single visit (FTFR), and how much of the logged time is billable.
Outcome: you decide with your own numbers, not with how the week felt.
Operations reports
Utilization, completion, visits, and labor margin from real data.
jobs completed
92%
46 of 50
FTFR
87%
40 jobs in a single visit
billable utilization
74%
296.0 h of 400.0 h
11 visits in the visible range.
Martín Echeverría
3 visits · 6.5 h plannedNext: Arrived
Next: Dispatch
Diego Ferrari
2 visits · 4.5 h plannedNext: Dispatch
Daily view · company time zone (America/Guayaquil)
A job is not finished when the technician leaves. It is finished when the customer has signed, the report is approved, and the invoice is out.
Dispatch, the technician’s phone, the technical report, and contracts all work on the same order.
Swipe to see more views.
Unscheduled jobs on top and each technician’s day below, with the next action on every visit.
9 visits in the visible range · 2 unscheduled.
Unscheduled (2)
Next: Drag onto the board
Next: Drag onto the board
Carla Duarte
3 visits · 7.5 h plannedNext: Close
Mirador del Valle Hotel · Basement 1Next: Dispatch
San Rafael Clinic · Tower BNotes, photos, audio, and video from the visit; AI proposes a draft and a manager approves it before the PDF.
Evidence → Draft → Review → PDF for the customer
Record what you saw, the measurements, and the work done. You can do it from your phone.
Leak at the ball-valve joint on the return line. Mains pressure 3.2 bar.
Message · 8f2c41a0
Two valves replaced and tested for 30 min with no dripping.
Message · 1b7e93d2
return-valve-before.jpg
test-30min.mp4
Version 2 · Approved
Today’s visits on their phone, with time, status, customer, and address.
Local data — offline
Preventive on electrical panel
Santa Inés School
Av. Los Shyris N41-150
Capacitor replacement — 3rd-floor A/C unit
San Rafael Clinic
Tower B · Av. Amazonas 1450
Booster pump inspection
Los Álamos Condominium
Calle Las Acacias 230
Response and resolution times by priority, coverage, and the work order for each period.
| Priority | Response | Resolution |
|---|---|---|
| Urgent | 4 h | 24 h |
| High | 8 h | 48 h |
| Normal | 24 h | — |
HVAC, electrical, electronic security, building maintenance, and installations: if your technicians go out to customers every day, Adqueo Field is built for you.
Adqueo Field opens through early access. There is no public date: we will let you know when there is room for your operation.
01Today
Tell us how many technicians you have, what kind of jobs you do, and how you dispatch today.
What you get: a place on the early-access list.
02When your access opens
We go through your job types, contracts, parts, and the way you close and invoice.
What you get: an agreed initial setup before any data is loaded.
03Initial load
Customers, properties, parts catalog, checklist templates, and technicians with their shifts.
What you get: your dispatch board ready for day one.
04First weeks
You start with one crew, we adjust what is needed, and then you add the rest of the team.
What you get: your first orders closed and invoiced from the app.
Leave your email and tell us how your field team works. No commitment and no made-up date.
Need something built around your operation? Let’s talk custom software →