Latest Adqueo update: Fix · CMMS: PM schedule drift on DST boundariesSee what's new →
Adqueoby Tecapa

SafetyComing soon

No high-risk job starts without a signed permit.

Adqueo Safety keeps work permits, the people qualified to do the work, your contractors, inspections, and incidents in one record. A permit is not activated until the right people approve it, in order, and the evidence is there for the audit.

  • Ordered approval and signature
  • Only qualified people
  • Evidence that cannot be edited

What running safety on paper and spreadsheets costs you today

It is not a lack of commitment. The permit is in a binder, the course expiry in another spreadsheet, and the finding in an email. Nobody sees the whole picture until something happens.

Reference range
3–5 days
is what gathering a quarter’s evidence often takes when permits live on paper.
20–40%
of findings in a round tend to repeat when nobody owns them with a close-out date.
  • Work that starts before the signature

    The contractor is already at height and the permit is still waiting for the safety manager. The signature comes later, if at all.

  • People without a current qualification

    The induction expired last month, or the work-at-height course was never recorded. Nobody checked at the gate.

  • Audits prepared by hand

    To show who approved what and when, someone spends days pulling binders, photos, and emails together.

  • Findings and incidents that never close

    The inspection found the loose guardrail, but nobody knows whether it was fixed or who checked.

Outcomes

What changes in your operation

Each outcome rests on a concrete record in Adqueo Safety. The panels are replicas of the app with sample data.

Swipe to see all five outcomes →

  1. 01 / 05

    No high-risk work without an approved, signed permit

    The permit goes through its authorization chain in order: supervisor, operations, and safety. Each step requires its role permission, and nobody approves twice in the same revision. Only once approved and signed is it activated within its work window.

    What changes: Work starts with a valid permit, not with a pending signature.

    SafetyWork permits · PTW-2026-0142Sample view
    PTW-2026-0142In approval · scheduled windowHigh risk

    Light fitting replacement in dispatch bay

    Work at height · v3North plant › Bay 2

    ⋯
    PeopleApprovalsRisksHistory

    Approvals

    SupervisorLuis Paredes · Oct 13, 16:40Approved
    FacilityCarla Méndez · Oct 14, 07:10Approved
    HSEPendingRequires: Approve high or critical riskPendingApprove HSE stepReject
  2. 02 / 05

    Only qualified people go in

    Each permit type declares which qualifications it requires: work at height, confined space, rigger. When the permit is built, Safety shows who is fit and blocks anyone whose qualification or induction has expired.

    What changes: The check someone used to do at the gate is now done by the system, every time.

    SafetyPermits · RequestSample view
    Permit requestStep 4 of 7 · Who

    Who · personnel and approvers

    Ana RíosContractor · MR-014 · 45678912Fit
    Jorge SalazarContractor · MR-022 · 41236587qualification missing or expired: Work at heightBlocked
    Miguel TorresPlant · PN-108 · 40987123Expiring
    Rosa HuamánContractor · MR-031 · 47851236induction pendingIncomplete
    Approval chain
    1Supervisor ›2Facility ›3HSE
    BackContinue
  3. 03 / 05

    Contractors with their paperwork up to date

    Every contractor company carries its status, its approval, and its document compliance percentage. Each permit type defines which documents it requires and what happens when one is missing: block, warn, or allow an authorized exception.

    What changes: You know before entry which contractor can work and which cannot.

    SafetyPeople and companies · CompaniesSample view
    PeopleCompaniesQualification
    CompanyCompliance
    Montajes RíosWork at height94%
    Climatización VérticeAir conditioning68%
    Soldaduras del PacíficoHot work42%

    Document requirements

    Contractor
    • Civil liability policyWarning
    Workers
    • Jorge Salazar · Occupational medical examBlocks
  4. 04 / 05

    A critical finding stops the work and closes with verification

    Inspections run on versioned templates. If a critical finding is linked to an active permit, the permit is suspended. The finding is escalated to a corrective action with an owner, a due date, and subtasks, which only closes with evidence and a different verifier when required.

    What changes: What the round finds gets fixed, and someone checks it.

    SafetyInspections · RunSample view
  5. 05 / 05

    Incidents reported on time and followed up

    Anyone can report from a QR code on site, without an account. The report comes in as unverified and the safety team decides whether to turn it into an incident. If an incident is still waiting for triage, Safety raises an alert based on its severity. Closing a high or critical one without a closed corrective action requires a justification.

    What changes: You hear about the near miss, not just the accident.

    SafetyIncidentsSample view
    Search number or title…+ Report incident
    Triage and assignment queueShows open incidents so you can decide the next step.
    To triageUnassignedSee all
    INC-2026-00018Tool dropped from scaffoldNorth plant · Near miss · Oct 03, 15:42NewHigh
    INC-2026-00017Oil spill in loading yardNorth plant · Environmental · Oct 02, 10:05TriageMedium

Safety is not proven with a thick binder. It is proven with a record where every approval, signature, and suspension was written down when it happened.

What holds those outcomes up

More views from the app: risk, the event log, corrective actions, and on-site reporting.

Swipe to see more views →

  • What needs your decision today

    Permits awaiting your approval, overdue CAPA, and open incidents, on your home page.

    SafetyHomeSample view

    Good morning, Ana

    Tuesday, October 14As of Oct 14, 09:30Needs follow-up
    Needs your attention
    2 permit(s) awaiting your approval1 overdue CAPA(s) need follow-up3 incident(s) still open
    6Permits in active status1Critical risks4Open findings5Pending CAPA
  • Risk assessed before approval

    5×5 matrix with initial and residual risk. A high residual needs safety approval; a critical one cannot be activated.

    SafetyRisksSample view

    5×5 matrix (probability × consequence)

    Probability × residual consequence. Two-axis assessments only.

    ResidualInitial
    L · LOWM · MEDIUMH · HIGHC · CRITICAL
    ConsequenceP55M10H15H20C25CP44M8M12H116C20CP33L6M29M312H115HP22L4M56M48M210HP11L2L33L4M25M
  • A log that cannot be edited

    Every submission, approval, signature, activation, and suspension is kept with its time and author. Print it or save it as PDF.

    SafetyWork permits · PTW-2026-0142Sample view
    PTW-2026-0142Suspended · window openHigh risk

    Light fitting replacement in dispatch bay

    Work at height · v3North plant › Bay 2

    ⋯
    ApprovalsRisksHistory
    1. Approved
    2. Signature recorded
    3. Activated
    4. Suspended by the systemSystem · Stop-work for critical finding: Loose platform guardrail
  • Corrective actions with verification

    Owner, due date, and subtasks. It does not close without finished tasks, evidence, and a different verifier when required.

    SafetyCorrective actionsSample view

    Secure platform guardrail in Bay 2

    Owner: Carla MéndezDue: Oct 21, 2026
    Critical
    In progress
    Finding · Loose platform guardrail
    Verification criteria

    Guardrail bolted at all four supports and a load test recorded with a photo.

    Requires an independent verifier: Yes

    Subtasks
    1 of 3 completed · 2 left
    Close-out guards
    blocked
    Complete the 2 remaining tasks to enable verification.

    The action only closes with all tasks done, evidence attached, and a different verifier when required.

    Verify and close
  • Reports from the site QR code

    People on site report without an account. The safety team receives it unverified and decides: ask for information, discard, or turn it into an incident.

    SafetyIncidents · Public reportsSample view
    2PendingAll

    Mezzanine stairs, level 2

    Oct 04, 09:12 · unsafe_condition

    Unverified

    A step is missing and the stairs shift when you climb with a load.

    Contact: night shift, warehouse

    Triage comment (optional)
    Ask for informationDiscardConvert to incident

How you will get started

Adqueo Safety is in early access. We start with a few companies, one site, and the permits that carry the most risk for you. We will not give you dates we cannot keep.

  1. 01First

    You walk us through your operation

    We review the high-risk work you do, how you approve permits today, and how you manage contractors. We pick a pilot site.

    You leave with: Pilot scope and the list of data to gather

  2. 02Next

    Your permit types and your rules

    We set up permit types with their approval chain, their forms, and the qualifications each one requires. We load sites, contractors, and people.

    You leave with: Permit types and personnel loaded

  3. 03In the pilot

    Real permits on one site

    Your team issues, approves, and activates permits in Safety. Inspections start on your templates, with the reporting QR on site.

    You leave with: Permits and rounds with evidence

  4. 04Then

    Extend at your pace

    With the pilot as the model you add sites, permit types, and contractors. You decide when.

    You leave with: The whole operation in one record

Questions

We will let you know when Safety is available

Leave your details and tell us which high-risk work you manage today. We will write when access opens, with no commitment.

If your process does not fit a product — custom software →