Recover heat from continuous blowdown
Estimated saving
US$ 9,800/yr
≈ 426 t/yr · 2026-08 rate
- Investment
- US$ 24,000
- Payback
- 30.5 months
- 5-year NPV
- US$ 11,785
- IRR
- 28%
Round · Boiler 2 · round 2
Adqueo EnergyAlpha access
Balance by network and by equipment, regression baselines, and measurement and verification for every project. Adqueo Energía turns your readings into an investment plan with calculated payback, and into savings that finance and auditors accept.
In alpha access for a small group of plants. No published prices: we quote based on your plant.
Main electricity
Electricity · kWh · 09/01 – 09/16 · 16 full days
Electricity flow
kWh · 09/01 – 09/16 · width is proportional to the quantity
Main electricity576,112 kWh
Transformation and efficiency
The cost of air and cooling is already in this energy, so the Summary does not add it again.
Reference range
What a plant usually leaves on the table
10–20%
of a plant’s consumption can usually be cut with low-risk operational and capital measures.
20–30%
of compressed air produced is typically lost to leaks when the network has no control program.
An opportunity portfolio with economic evaluation (investment, net savings, NPV, IRR, and simple payback) and a measurement agreement before execution. You prioritize by value, not by hunch, and every project closes with its verified saving.
Estimated potential
US$ 61,600
per year · 7 active opportunities
Planned investment
US$ 119,400
across active opportunities
Estimated NPV
US$ 107,323
sum of each case, at its horizon and rate
Verified
4
see their savings in Savings
Recover heat from continuous blowdown
Estimated saving
US$ 9,800/yr
≈ 426 t/yr · 2026-08 rate
Round · Boiler 2 · round 2
Variable speed drive on feed pumps
Estimated saving
US$ 7,200/yr
≈ 64,286 kWh/yr · 2026-08 rate
Energy review · Electric loads · 2025 review
Replace insulation on header valves
Estimated saving
US$ 4,700/yr
≈ 204 t/yr · 2026-08 rate
Round · Pressure-reducing station · round 6
Oxygen trim control on boiler 2
Estimated saving
US$ 16,600/yr
≈ 42,564 Nm³/yr · 2026-08 rate
Manual · Higher gas use at start-up
Recover water from the final CIP rinse
Estimated saving
US$ 8,400/yr
≈ 7,304 m³/yr · 2026-08 rate
Manual · Higher water use in CIP
Metering, baseline, verification, and data quality on a single record: the saving you report is the one that was measured.
US$ 295,787.98
7.7%vs. the same stretch of 2025Cooling and compressed air are produced on site with energy already paid for: they are not added again.
576,112kWh
4.5%vs. the same stretch of 2025Estimated US$ 64,525
Oct 25 – Sep 26 · dotted line: prior year
Purchased energy cost with its basis, each energy’s consumption in its own unit, and twelve months against last year. In a minute you see where spending goes up.
Readings by meter and day
A daily map per meter: readings approved, in review, missing, or by invoice. A saving calculated on incomplete data does not hold up; here you catch it before the close.
Period consumptionMeasured
1,089,620 kWh
ComparisonEstimated
4.21% below expectedMain electricity kWh· 08/18/2026 – 09/16/2026 · daily
An estimate, not a verified saving.
Regression with up to four variables, such as production or operating hours, and a ±2 RMSE band. You separate the effect of your measures from the effect of producing more or less.
Chiller control optimization
8 periods · January 2026 – August 2026
26,531.1 kWh cooling
Verified savings by period (kWh cooling)
| Period | Saving | Status | ||
|---|---|---|---|---|
| August 2026 | 539,980.6 | 535,930.8 | 4,049.9 | Verified |
| February 2026 | 546,111.9 | 548,296.3 | −2,184.4 | Verified Negative −0.4%: consumption above the baseline |
Savings = baseline + adjustment − actual, verified by the agreed reviewer.
Savings = baseline + adjustment − actual consumption, under the measurement agreement approved before execution. Every period is calculated, pending, or verified; negative months are reported too.
Quality queue4
Readings missing since 09/28
15 meters · 2 days with no reading. The September close stays pending until they are loaded.
Water balance open
Unmetered rises from 12.3% to 25.5% between 09/10 and 09/16. Reference limit 15%. Possible leak.
Calibration expired: Gas · Boiler 3
Expired on 09/24. Its readings keep coming in, flagged for review.
Compressed air: 28% unmetered, steady
Above the reference limit (20%) for the whole period.
Each network’s balance against its unmetered limit, reading gaps, and expired calibrations in a single queue. A water or air leak shows up as a signal, not on next month’s bill.
kWh, Nm³, m³, t, and cooling kWh are never added together. Energy transformed on site (air, cooling, own steam) never doubles its cost.
Every figure declares its basis: measured, invoiced, estimated, or verified. Finance knows which number it can sign.
Operations loaded 412 September readings09/27 18:04
Consultant corrected EL-BOMB · version 209/28 09:12
Manager approved the 2026 baseline09/28 11:30
Consultant published the September report · v110/01 16:45
Who loaded, corrected, approved, or published, and when. A published version is never edited: it is corrected, with a record.
Automatic metering and IoT
Adqueo Energía stores and analyzes interval series from smart meters and power analyzers: peak demand, overnight base load, and any day’s profile against another. Each source (meter, gateway, or SCADA) is connected within the project scope; meanwhile, data comes in from CSV or Excel.
15 minutes · kWh
Electricity · 15-minute intervals
Peak
1,922 kW at 14:15
2,106 kW on 09/17/2024
Base load 00–06 h
1,125 kW
1,072 kW in 2024 (+5%)
Profile of a Tuesday (kW)
Consultants and ESCOs
If you manage energy for several clients, My consultancy brings the portfolio together: each company’s cost, improvements, and alerts, its visit agenda, and every period’s reports. Each client sees only its own data.
Consultancy center
Inbox and portfolio
A view of each client and its next decision.
Alimentos del Sur
Food and beverage · 1 plant · 13 improvements
US$ 1,117,956 Utility cost · 2026-09
13 alerts to reviewCervecería Altiplano
Beverages · 2 plants · 9 improvements
US$ 642,310 Utility cost · 2026-09
5 alerts to reviewAgroindustria Valle Verde
Agribusiness · 2 plants · 7 improvements
US$ 388,540 Utility cost · 2026-09
3 alerts to reviewOn-site service · El Salvador
Tecapa Electric engineers walk your plant, survey meters and networks, measure where submetering is missing, and deliver the opportunities with their investment and payback. The result is loaded into Adqueo Energía, so savings tracking starts the same day.
A service by
On-site service available in El Salvador. The Adqueo Energía platform is available in every country.
We walk the plant with your team: meters, electricity, steam, air, water, and cooling networks, and the equipment that consumes the most.
You leave with: Meter inventory and network diagram
We measure where there is no submetering to close each network’s balance and locate unmetered consumption.
You leave with: Balance per network with unmetered consumption quantified
With your history and your production we build the baseline and the improvement portfolio, each item with investment, estimated savings, and payback.
You leave with: Opportunity portfolio prioritized by value
For the improvements you decide to execute, we agree how the saving will be measured before any work starts.
You leave with: Measurement agreements ready in Adqueo Energía
Adqueo Energía is in alpha access with a small group of plants. We start with a single one: the plant that spends the most.
Today
Leave your details and tell us which plants and energies you want to track. We use that to prepare the conversation.
You leave with: A place in the alpha program
Week 1
We review your meters, your bills, and how you record consumption and production today. We pick a plant and the energies that weigh most on cost.
You leave with: Pilot scope and the list of data to gather
First weeks
We load your meters and your history from CSV or Excel, build the metering network, and train the first baseline.
You leave with: A baseline approved by a second person
Then
We bring two or three opportunities to the board with their economic evaluation and agree how they will be measured before execution.
You leave with: The first period report, published
Alpha access for a small group of plants. Bring your latest bill and your meter list: in the first conversation we locate where the biggest savings potential is.