Food & Beverage ManufacturingComposite / illustrative — anonymized

Norteño Alimentos

A four-plant food manufacturer replaced whiteboards and radio calls with a work-order system built around its packaging lines and pumps.

Composite / illustrative — this case combines patterns from several engagements. Client name and specifics are fictional; the workflow and metric ranges reflect real project shapes.

Maintenance technician in a hi-vis vest and hard hat inspecting equipment panels in a plant.

The challenge

Maintenance ran on a shared spreadsheet, a radio channel, and whatever the shift lead remembered. Preventive maintenance slipped whenever a packaging line had a rush order, and nobody could say how far behind the plant actually was. Work requests arrived by phone or a sticky note on the supervisor's desk, so nothing was timestamped and nothing was searchable. When a pump seal failed on the third shift, the technician on call had to guess which spare bin held the right part. Corporate wanted a single backlog number across all four plants before the next budget cycle, and nobody could produce one without two weeks of manual reconciliation.

The approach

We specified the work order lifecycle first — request, triage, dispatch, evidence, close — before naming a single screen. The build was a mobile-first CMMS: technicians work from a native app that runs offline on the plant floor and syncs on Wi-Fi near the office, supervisors triage from a web console, and a nightly job reconciles parts consumption against the ERP so procurement sees real demand instead of guesses. Preventive maintenance schedules were rebuilt around actual asset criticality — pumps and PLCs on packaging lines first — instead of a generic annual calendar. A Grafana board gives each plant manager the same four numbers, refreshed hourly.

The outcome

MTTR ↓ 34% across all four plants
Open backlog ↓ 480 → 190 work orders
First-time-fix rate ↑ 62% → 81%
Unplanned line downtime ↓ 22%

We used to find out we were behind when a line stopped. Now the backlog number is just there, every morning, the same for all four plants — and it's the number we actually trust in the budget meeting.

Elena RíosHead of Reliability, Norteño Alimentos