PM compliance is a workflow problem, not a dashboard problem

A 91% PM number that nobody can explain is worse than a 70% number with a backlog you can work.

[Author][Role]7 min read

Preventive maintenance fails in the last mile: the window was stolen by a breakdown, the procedure PDF was the wrong revision, or the technician could not find the asset because the tag in the field does not match the CMMS.

  • Generate WOs from asset usage, not from a calendar nobody respects.
  • Attach the current procedure to the WO, not to a shared drive.
  • Block close-out without labour, parts, and a condition code.